Commit Graph
4 Commits
Author SHA1 Message Date
DongHyeonkaandClaude Opus 5.5 c5f379b82c docs: plan the 2026-09-25 maturity review fixes
SPEC maps all 138 findings to requirements and fixes the defaults for
the review's open choices (D-1..D-19). The plan runs gate/CI groundwork
first, then parallel area lanes, then integration.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-25 21:05:08 +09:00
DongHyeonkaandClaude Opus 5.5 d66ae19ad0 docs: plan round 3 for the eight remaining review items
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-24 15:10:30 +09:00
DongHyeonkaandClaude Opus 5.5 b95314245d docs: plan round 2 of the src review fixes
Add Q-requirements for every recommended/minor review finding plus the
round-1 follow-ups (SW fetch scope, bundle budget), decisions D-11..D-16,
and tasks T51-T115 across the same nine lanes.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-24 13:00:41 +09:00
DongHyeonkaandClaude Opus 5.5 ea0f01ff05 docs: plan fixes for src review critical and required findings
SPEC.md lists the 47 requirements (R-0, R-1.1..R-9.3) and decisions D-1..D-7.
tasks/plan.md and tasks/todo.md break them into 50 tasks across 9 lanes.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-24 11:48:19 +09:00