Commit Graph
4 Commits
Author SHA1 Message Date
DongHyeonkaandClaude Opus 5.5 b95314245d docs: plan round 2 of the src review fixes
Add Q-requirements for every recommended/minor review finding plus the
round-1 follow-ups (SW fetch scope, bundle budget), decisions D-11..D-16,
and tasks T51-T115 across the same nine lanes.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-24 13:00:41 +09:00
DongHyeonkaandClaude Opus 5.5 ee98444c43 docs: record src review fix results and open decisions
Mark all 50 tasks done, record the fresh-checkout gate results, the two
out-of-plan fixes (R-0 follow-up, inventory rows) and the decisions left
for the user (bundle budgets, SW fallback scope, session subject, disabled
query state, SSE multibyte speedup, V2 5xx).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-24 12:46:47 +09:00
DongHyeonkaandClaude Opus 5.5 f0d3953ef2 fix(build): render product index before entry points (R-0)
src/.generated is gitignored, but no entry point rendered it, so a fresh
checkout failed check:architecture, check:types:app/node/test, unit and
component tests, verify:documentation, dev and build.

- run-vitest renders the index before starting Vitest (all vitest suites)
- package scripts that load src (dev, build, storybook, architecture,
  app/node/test type checks, the five fixtures that reach the index,
  verify:documentation) render it first; CI runs these scripts by name
- tests/unit/product-index-entrypoints.test.ts guards the wiring

Verified from a fresh state (src/.generated removed before each gate):
architecture, types app/node/test, lint, unit 1781/1781, component 132/132,
verify:documentation, build, dev (HTTP 200), check:ci all pass;
fixture route-runtime still fails with its expected TS2740.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-24 11:52:34 +09:00
DongHyeonkaandClaude Opus 5.5 ea0f01ff05 docs: plan fixes for src review critical and required findings
SPEC.md lists the 47 requirements (R-0, R-1.1..R-9.3) and decisions D-1..D-7.
tasks/plan.md and tasks/todo.md break them into 50 tasks across 9 lanes.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-24 11:48:19 +09:00