Performance Evidence Contract

A performance refactor is not complete because code looks faster. It needs a comparable before/after experiment.

Lifecycle

A performance item uses READY → BASELINING → IN_PROGRESS → VERIFYING → WAITING_APPROVAL. BASELINING is measurement-only. Source changes are forbidden until the baseline at analysisRevision has been retained and the item moves to IN_PROGRESS.

Before code changes

Freeze the measurement contract in work-item.json:

  • exact command or reproducible procedure;
  • cwd;
  • environment record;
  • dataset/fixture/load profile;
  • warmup and iteration policy when relevant;
  • metrics and units;
  • acceptance criteria.

Capture baseline raw output under evidence/baseline/raw/ and fill evidence/baseline/metadata.json with source revision, command, cwd, exit code, dataset, metrics, and raw file references.

After code changes

Use the same measurement contract. Capture raw output under evidence/after/raw/ and the matching metadata file.

Comparison

evidence/comparison.md must state whether conditions are materially equivalent and list baseline, after, delta, acceptance result, functional regression checks, conclusion, and limitations.

Allowed conclusions: IMPROVED, NEUTRAL, REGRESSED, INCOMPARABLE.

If command/procedure, metric definition, dataset/load profile, or material environment differs enough to invalidate comparison, use INCOMPARABLE. Do not convert incomparable measurements into an improvement claim.

Evidence quality

Retain raw output. A hand-written summary alone is insufficient. Do not fabricate missing runs. Avoid secrets at command construction time rather than relying on later redaction.