DongHyeonka b1140efbb9 docs(reviews): record the phase-two follow-up in the maturity review
The owner decisions in section 8 were settled on 2026-11-12 and the
section 7 recommendations went into separate PRs. Readers of the
review need to know where each one landed and that one recommendation
was withdrawn.

Add a table from each 7.x item to its PR, withdraw protect-kernel-
defaults (CIS dropped it in v1.7 and its kernel.panic_on_oops=1 would
reboot this dual-boot desktop on any oops), and note that the API
server certificate is measured with openssl on the host instead of a
blackbox probe.

Risk: documentation only.

Verification: the PR numbers match the open and merged platform-core
PRs on 2026-11-12.