ci: run the TechLog contract drift gate in CI and test:all
`check:tech-log-contract` existed and worked but nothing ran it. No gate in `config/ci/gates.json` referenced it and `test:all` did not chain it, so a hand-edit of the vendored canonical yaml or of `generated.ts` passed every gate the repository actually executes -- the exact regression the digest pin exists to prevent. FE-GATE-010 (architecture/contract governance) now owns the command, beside `check-registries` and `check-ci`, and `test:all` runs it in front of `test:tech-log`. The canonical authority baseline moves to 83 command definitions / 95 references and the gate-shape SHA-256 is recomputed with `canonicalGateShapeSha256`; the recomputation was first verified by reproducing the previous constant from the previous gates.json. `tests/features/tech-log/contract-generation.test.ts` now fails if either wiring is removed again. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
This commit is contained in:
co-authored by
Claude Opus 5
parent
5c997f3a7e
commit
f19be639a3
@@ -185,9 +185,10 @@ describe("selective Task 3 contract closure", () => {
|
||||
// product's 26/81; the artifact set is the product's 126 plus the
|
||||
// template's 2. Task 11 added TECH_LOG_STUDIO_ASSETS's manual
|
||||
// accessibility evidence, bringing the total to 129.
|
||||
// Final fix wave item 1 added `check-tech-log-contract` to FE-GATE-010.
|
||||
expect(canonical.gates).toHaveLength(27);
|
||||
expect(canonical.commands).toHaveLength(82);
|
||||
expect(canonical.gates.reduce((sum, gate) => sum + gate.commandIds.length, 0)).toBe(94);
|
||||
expect(canonical.commands).toHaveLength(83);
|
||||
expect(canonical.gates.reduce((sum, gate) => sum + gate.commandIds.length, 0)).toBe(95);
|
||||
expect(canonical.artifacts).toHaveLength(129);
|
||||
expect(canonical.stages).toHaveLength(5);
|
||||
expect(canonical.retention.classes).toHaveLength(5);
|
||||
|
||||
Reference in New Issue
Block a user