init: technical-visualization-haness 하네스 설계

This commit is contained in:
DongHyeonka
2026-07-24 14:02:50 +09:00
parent 09d7c594da
commit f43e909162
117 changed files with 10150 additions and 1 deletions
+41
View File
@@ -0,0 +1,41 @@
# Diagram-type decision guide
## Context
Shows the system of interest, external people/systems, and directional interactions. It deliberately hides internal implementation. Use for onboarding, scope, and ownership discussions.
## Architecture / container / component
Shows stable responsibilities and dependencies at exactly one abstraction level. Use “container” for independently deployable/runnable units and “component” for meaningful internal modules only when the prose supports that distinction.
## Deployment / network
Shows runtime placement, regions/zones, compute nodes, network/trust boundaries, and deployment mappings. Do not add infrastructure inferred from common practice.
## Data flow
Shows sources, transformations, stores, sinks, and sensitive-boundary crossings. Label edges with data, events, or protocols. Separate control flow when it would obscure data movement.
## Sequence
Shows one scenario in chronological order. Every edge needs an explicit order. Use separate diagrams for success and materially different failure paths.
## Flow
Shows procedural steps and decisions. Decision labels should be questions; outgoing edges should state conditions. Avoid using a flowchart for static architecture.
## State
Shows valid states, triggering events, and transition constraints. Nodes are states, not actions.
## ERD
Shows entities and cardinality. Do not infer keys or cardinality from naming conventions.
## Dependency
Shows structural dependencies where graph topology is the primary message. Use Graphviz-style layout and filter low-value transitive or generated dependencies.
## Concept
Explains a mental model, trade-off, or mechanism without claiming implementation topology. Use generic shapes and label it clearly as conceptual.